Pricing

One job. One fee.
Two levels of detail.

Send us the drawings and choose how far you want the quantities taken. Both are a fixed price per project.

Marked up plan
Bill of Quantities
ItemDescriptionUnitQty
01Slab on ground, 100mmm²93.64
02Perimeter footings, 400 x 400lm45.45
03Internal stud framed walllm51.12
04Colorbond roof aream²96.20
05Plasterboard ceilingm²192.80
06Main floor tilingm²133.34
07Gutter and fascialm18.24
08Windows, measured aream²77.27
Option 01

Entry Level Bill of Quantities

The main quantities for the build, measured and set out so you can start pricing.

$850+ GST per project
  • Quantities for the main building elements
  • Areas and lengths measured from your plans
  • Marked up plans showing what was measured
  • Bill of Quantities supplied in Excel
Start with Entry Level
Most detail Marked up plan Counted items
Bill of Quantities
ItemDescriptionUnitQty
Demolition
1.01Remove roof timber and roof coverm²59.17
1.02Remove timber framed wallslm27.26
1.03Remove windowseach12
Electrical
6.01Downlightseach59
6.02Double power pointseach34
6.03Data pointseach9
Joinery
7.01Kitchen cabinets and kickboardlm12.29
Option 02

High Level Bill of Quantities

The full take off, trade by trade, down to the counted items.

$1,695+ GST per project
  • Everything in Entry Level
  • Every trade measured, from demolition to fit out
  • Counted items: doors, windows, lights, power, fixtures
  • A marked up plan and legend for each trade
  • Itemised Bill of Quantities in trade order
Start with High Level
What lands in your inbox

Three things you can
check for yourself.

Bill of Quantities
ItemDescriptionUnitQty
Concrete
2.01Slab on ground, 100mmm²93.64
2.02Perimeter footings, 400 x 400lm45.45
2.03Internal thickening footingslm16.27
Framing and linings
3.01Suspended timber floorm²73.86
3.02Internal stud framed walllm51.12
3.03Plasterboard to one side onlylm72.61
Roofing
4.01Colorbond roof aream²96.20
4.02Gutter and fascialm18.24
4.03Downpipeseach12

The Bill of Quantities

Each item with its unit and quantity, grouped by trade and ready to price.

Marked up plan

The marked up plans

Your drawings handed back with every measured area shown on them.

Take off legendCeilings
MeasuredUnitQty
Plasterboard ceilingm²120.71
Ceiling and insulationm²67.41
Floor protectionm²7.99
Take off legendElectrical
CountedUnitQty
Downlightseach37
Double power pointseach23
Data pointseach3

The take off legend

A key for each sheet, so every colour on the plan ties back to a number.

Examples are from a real renovation take off. Project details removed.

Side by side

Which one suits the job?

Entry Level$850 + GSTHigh Level$1,695 + GST
Main building quantities (slab, walls, roof, ceilings, floors)
Marked up plans returned
Bill of Quantities in Excel
Demolition and site items
Counted items (doors, windows, lights, power, fixtures)
Joinery and fit out, room by room
Plan and legend for each trade

Send us your
next set of plans.

Tell us which level you want. An estimator will confirm the job and get started.

Send your plans